July 2011
Lyneham Sports Precinct Stage 2
Works under the Stage 2 contract consisted of the supply and management of all labour, plant and materials necessary for the construction of the Lyneham Sports and Recreation Precinct including associated road and civil infrastructure as well as landscaping works.
The Works includde environmental protection measures, temporary traffic management ,earthworks including cutting and filling of site materials and importation and disposal of materials as required, stormwater and subsoil drainage, sewer and water reticulation including provision of a non potable watermain, installation of electrical conduits, street lighting and flood lighting, road pavement construction, temporary and permanent traffic control devices, construction of playing fields and associated irrigation, landscaping, quality assurance testing and reporting, ancillary works including coordination, commissioning and liaison with asset owners.
Other important issues that neeedd to be managed included erosion and sedimentation control, dust mitigation, geotechnical and environmental supervision.
All works were required to comply with the requirements specified by the Specification, Drawings, Contract in general, and to ensure compliance with all relevant standards, regulations and legislation. |